Hydropower Stations

Studied Projects

Qattara project

Average Head (m) : 50                                 Discharge m3/s :3600

Installed Capacity MW : 1800                     Annual Energy M.KWH:3200

number of units :                                           turbine type:

Expected Emission Reductions (Ton/year Co2): 1755000

 
 

Attaqa project

Average Head (m) : 600                              Discharge m3/s :318

Installed Capacity MW : 2100                   Annual Energy M.KWH:6500

number of units :                                          turbine type:  

Expected Emission Reductions (Ton/year Co2): 3400000

 

 
Dammieta project

Average Head (m) : 4.2                               Discharge m3/s :310

Installed Capacity MW : 13                         Annual Energy M.KWH:84

number of units :2                                          turbine type: Vertical Kaplan 

Expected Emission Reductions (Ton/year Co2): 85000